Alberta Tar Sands & Sudbury Basin- Lesson 22 – Part 2 of 8 •Open pit mining •Mining the tar sands •Bucket wheel, conveyor •By products; sulphur and coke can be a problem •Tailings waste 24000 gal per min. adequate dyke construction needed •Syncrude using draglines •Richest concentration near the bottom of the beeding of the tar sands 18% •Bitumen different than the oil
Tags: big, conveyor, dyke, earth, fort mcmurray, near, oil-sands, per, problem, put, ran, side, tar